901 Cherry Avenue (The Gap)

San Bruno, CA
Market: 
Office
Products: 
Garden Roof® AssemblyGarden Roof® Assembly: Intensive
Size: 
82,000
 sq. ft. pi. ca.
Completion Date: 
1997

When Gap Inc. decided to build their first company owned office building, they wanted the facility to embody the company's commitment to the environment. By incorporating a green roof into the design of 901 Cherry, the architects dramatically improved the building's energy efficiency and reduced the demand on local storm sewers. In addition, the presence of native grasses and wildflowers on the roof helps the building blend with the surrounding landscape

 

Unlike a traditional roof, a green roof is designed to retain water, placing added importance on the impenetrability of the roofing membrane. By specifying MM6125®, the design team selected a membrane known for its watertight integrity and ability to perform even under submersed conditions. Fluid-applied and flexible, MM6125® readily conformed to the undulating surface of the building's roof deck. And because the membrane is fully adhered to the deck and has no seams, there is little risk of having to remove soil and plants to track a leak. MM6125® is also resistant to fertilizers and most acids.

 

In addition to 901 Cherry, Hydrotech has supplied materials for earth covered facilities worldwide. And now, through the introduction for the Garden Roof®, a green roof system developed by Hydrotech, building owners and design professionals can transform any new or existing roof into a landscaped environment. 

Awards: 
2003 Green Roofs for Healthy Cities Award of Excellence - Extensive New Construction Category
Owner: 
The Gap, Inc
http://
Architect: 
William McDonough + Partners/Gensler
http://
Landscape Architect: 
Hargraves & Assoc.
http://
http://
General Contractor: 
Swinerton & Walberg
http://
http://
http://

Recent Press

UPCOMING EVENTS

  • May 11, 2018

    RCI Western Canada Chapter Spring Seminar & Tradeshow

    Italian Cultural Centre, 3075 Slocan St – Vancouver British Columbia Event Details
  • May 16, 2018

    Grey to Green conference

    Colony Ballroom, Chestnut Conference Centre, 89 Chestnut St. – Toronto Ontario Event Details
  • May 23, 2018 to May 27, 2018

    CSC National Conference

    The Westin Edmonton Hotel – Edmonton AB Event Details
  • June 5, 2018 to June 7, 2018

    Building Lasting Change 2018

    Beanfield Centre, 105 Princes' Blvd – Toronto Ontario Event Details