Centre hospitalier de l'université de Montréal – (CHUM)

Montreal, Canada
Market: 
Healthcare
Products: 
Garden Roof® AssemblyGarden Roof® Assembly: ExtensiveRoofingWaterproofing
Project Type: 
New Construction
Size: 
225,000
 sq. ft. pi. ca.
Completion Date: 
2017
CHUM buildingCHUM Level 8 vegetated terraceCHUM Level 8 vegetated terraceCHUM Level 8 vegetated terraceCHUM Level 8 vegetated terrace

IMPERCO, a specialized contractor, successfully waterproofed 216,000 sq. ft. of the project's slabs, terraces, and foundation walls. Couverture Montreal Nord waterproofed the 11,600 sq. ft roof, which is now covered by terraces. They also waterproofed the 8th and 10th floor, which feature vegetated areas totaling 3,500 sq. ft.

Monolithic Membrane 6125 has been used on most hospital projects in the Montreal area.

Awards: 
LEED NC Silver aimed
Owner: 
Centre hospitalier de l'Universite de Montreal
http://www.chumontreal.qc.ca/
Architect: 
Cannon Design
https://www.cannondesign.com/
NEUF Architectes
PPP
Landscape Architect: 
NIP Paysage
http://nippaysage.ca/fr/
http://
General Contractor: 
Construction Sante Montreal (OHL and Laing O'Rourke)
http://
Landscape Installer: 
Amenagement Cote Jardin
https://cotejardin.com/
Installer: 
Couverture Montréal Nord
http://couverturemontrealnord.com/
http://

Recent Press

  • November 11, 2019

    Climate change and stormwater management

    A new color is emerging in the roofing field; after green roofs and white roofs, now here is the blue roof. The dense nature of urban areas, combined with the increased intensity of rain events and...

  • May 2, 2019

    CHICAGO, ILLINOIS (May 2, 2019) Very near Lake Michigan in Chicago, Northwestern Medical Center faced several challenges in bringing a new campus building to life. Designed by Perkins+Will, the project involves...