Embassy construction is intense, especially when it comes to security. The design and site are guarded with systems that grant credibility to Hollywood’s illicit entry scenes. Every flinch is recorded on tape, identification checked and re-checked, confidentiality agreements secured, cameras and cell phones taken.

 
Perhaps then it is not surprising that the architects hired to design embassies approach the building product selection process with the same scrutiny the guards show to site visitors. Product choices like waterproofing and roofing are evaluated at length. Skidmore, Owings & Merrill (SOM), whose excellent reputation is universally recognized, chose Hydrotech’s MM6125® waterproofing for The Embassy in Ottawa, Canada. After all, Hydrotech waterproofing and/or roofing systems had been applied on 253 of SOM’s completed projects.
 
MM6125’s excellent track record, superior crack bridging ability and thick, seamless application provided the durability and performance the project required. And because most Hydrotech applicators have been applying our assemblies for years, the quality of our products is carried through to the field.
 
Hydrotech’s commitment to quality even includes technical assistance and a single-source warranty program - the combination needed to lock up a project as closely guarded as this one. And the results are not only secure, they’re quite beautiful.
Owner: 
United States Government, Department of State
http://
Architect: 
Skidmore, Owings & Merrill LLP
http://
http://
http://
General Contractor: 
Axor
http://
http://
http://
http://

Recent Press

  • November 11, 2019

    Climate change and stormwater management

    A new color is emerging in the roofing field; after green roofs and white roofs, now here is the blue roof. The dense nature of urban areas, combined with the increased intensity of rain events and...

  • May 2, 2019

    CHICAGO, ILLINOIS (May 2, 2019) Very near Lake Michigan in Chicago, Northwestern Medical Center faced several challenges in bringing a new campus building to life. Designed by Perkins+Will, the project involves...

UPCOMING EVENTS

February 26, 2020

Resilient design CSC building Expo

Metro Toronto Convention Centre, South Building, Hall G – Toronto Ontario Event Details